Availability:Temporarily out of stock — ask for availability
Shipping cost:From 3.76 Euro
catalog number:G81055
Availability:
EAN code:5901477132025
Product condition:New, originally packaged
Guarantee:24 months of consumer protection
Weight:8,46 kg
By purchasing this product, you will receive 1100 points from us, which you can use for shopping in our store. This applies only to customers registered in our store.
Earth auger driven by a 42.7 cm³ two-stroke engine. The set includes a 25 cm diameter, 80 cm long auger bit designed for ground works in gardening and construction.
The 1.25 kW power unit delivers sufficient torque for drilling in compact soils. Air cooling removes the need for a liquid cooling system, which simplifies the design and reduces the weight of the unit.
The electronic CDI (Capacitor Discharge Ignition) system ensures reliable starting across a range of temperatures. The L7T spark plug is a standard service part available from most parts retailers.
The 25 cm diameter matches typical requirements for installing fence posts and tree saplings. The 80 cm working length allows holes of up to 70-75 cm deep to be drilled, which is sufficient for most gardening applications.
The low working speed increases torque and prevents the auger bit from jamming in hard ground. This speed makes the unit easier to control and reduces the risk of damaging roots or buried cables.
| Model | GEKO G81055 |
| Engine power | 1.25 kW |
| Displacement | 42.7 cm³ |
| Engine type | Two-stroke, air-cooled |
| Ignition system | CDI |
| Spark plug | L7T |
| Fuel tank capacity | 950 ml |
| Fuel mixture ratio | 1:25 (95 petrol:two-stroke oil) |
| Gearbox oil | SAE 80-90 |
| Auger bit diameter | 25 cm |
| Auger bit length | 80 cm |
| Rotation direction | Clockwise |
| Auger bit speed | 200-230 rpm |
| Unit height | 100 cm |
| Weight | approx. 14 kg |
| Certification | CE |
The engine requires a mixture of 95 octane unleaded petrol and two-stroke engine oil at a ratio of 1:25. This means 40 ml of oil per 1 litre of petrol. The mixture should be prepared in a separate canister and mixed thoroughly before filling the tank. Do not store the mixture for longer than 30 days.
The drive gearbox requires SAE 80-90 gear oil. The oil level should be checked every 20-25 hours of operation. The oil in the gearbox is changed after the first 10 hours of operation, then every 50 hours or once a season.
The unit is fitted with a cut-off system that stops the engine if control is lost. During operation, maintain a stable stance, hold the auger with both hands and keep a safe distance from buried cables. Before starting to drill, it is worth checking the location of underground services.
Nobody has written a review for this product yet. Be the first to write a review.
Write a review for this product and you will receive 100 points from us that you can use for shopping in our store. This applies only to customers logged in and registered in our store.
Only registered customers can write product reviews. If you have an account in our store, log in to it, if not, create a free account and write a review.
Client: Ro...yk,date of purchase 18-01-2023 18:44
Client: Ma...ki,date of purchase 24-02-2022 11:18